Office move checklist for London: a 12-week plan

Give a London office move twelve weeks: weeks 12–9 for lease dates, budget and surveys, weeks 8–5 for the move plan, RAMS, IT and telecoms lead times, weeks 4–2 for crate delivery, floor plans and staff briefings, and the final fortnight for the switchover itself and the snagging week that follows. Anything under four weeks is possible but costs more and carries real risk on lift bookings and comms provisioning.

By The Hello Services commercial moves team · Published 2026-08-27 · Updated 2026-08-27

Illustration of Hello Services cleaning London offices out of hours — a City tower floor with desks being sanitised, a converted warehouse studio being vacuumed, a period West End office being wiped down, a consumables and recycling round outside, and a branded van in a permit bay

The guide

Office Move Checklist for London: A 12-Week Plan in full

Weeks 12–9: dates, budget and surveys

Everything downstream hangs off two dates: when the new floor is available for fit-out, and when the old lease ends with dilapidations complete. Get both in writing before you brief anyone internally, because they rarely align neatly and the gap decides whether you need business storage.

Book removal surveys at both addresses in this window. A surveyor counts desks, IT positions, storage units and anything unusual — safes, plan chests, server racks, a kitchen — then reads the access at both ends. That is what turns a guess into a fixed project price you can put in the budget.

  • Confirm lease end, dilapidations scope and new-floor access dates
  • Book removal surveys at both addresses and get fixed project prices
  • Check the destination building's rules: lift booking, out-of-hours access, insurance limits
  • Give telecoms and broadband providers notice — this is the single longest lead time in the whole plan

Weeks 8–5: the move plan, RAMS and IT

Approve one supplier and lock the switchover weekend. In London the last weekend of a month and every quarter-end go first, so a date held now is worth more than a slightly cheaper quote taken later.

Your mover issues the method statement, risk assessment and insurance certificates in this window, because most managing agents want them at least five working days ahead and some want them signed off by building management before passes are issued.

Run IT in parallel. Circuits, patching and any new cabling at the destination need to be live and tested before move weekend — a crew can rebuild a floor in a night, but nobody can conjure a leased line on a Sunday.

  • Sign the move plan and confirm the switchover window with both buildings
  • Issue RAMS and insurance certificates to your managing agent
  • Confirm structured cabling, patching and circuit live dates with your IT provider
  • Decide what is being disposed of — desking, pedestals, screens — and get it quoted as part of the move

Weeks 4–2: crates, floor plans and people

Crates arrive about a week before the move with labels and a seat-numbered destination plan. Give staff a fixed pack-down deadline — end of business the day before the move, not the morning of it — and make it clear that personal items and desk plants travel with them.

Publish the destination floor plan with seat numbers on it. Every crate, monitor bag and pedestal gets that number, which is what makes a rebuilt floor findable at 08:00 on Monday rather than a treasure hunt.

Brief reception, security and cleaners at both buildings, and tell clients and suppliers the address is changing. Update the Google Business Profile, invoices, letterheads and email footers on a date you set, not ad hoc.

  • Crates and IT bags delivered, labels issued, packing deadline announced
  • Seat-numbered floor plan circulated to staff and to the move crew
  • Confirm lift slots, loading bays and out-of-hours access at both ends
  • Book the clearance load for redundant furniture and WEEE

Need the per-desk figure in writing for the board pack?

A free site survey covers lifts, loading bays and out-of-hours windows, and produces a fixed written quote with method statement and RAMS.

The switchover weekend and the week after

Loading starts after close of business. Protection goes down on lifts, floors and door frames first, then crates and IT travel, then furniture. At the destination the floor is built to the plan and workstations reconnected so a sample of desks can be powered up and tested before the crew leaves.

Keep the snagging week deliberately light on meetings. Expect a handful of missing cables, one monitor arm that will not fit and at least one department that wants to move two desks. Empty crates are collected within five working days, and the waste transfer note for anything cleared goes into the dilapidations file.

Questions

Quick answers from this guide

Plan twelve weeks end to end. The physical move is much shorter — a 10-desk suite goes in an evening, 50 desks over a Friday-to-Sunday weekend and a full floor across a long weekend — but telecoms provisioning, RAMS approval and building lift bookings are what actually set the timetable.