The SE16 stock around Canada Water Library is post-war. ONS records 90% flats, 10% houses and 4,483 households in Canada Water.
Private renting sits at 33% and owner-occupation at 20%; the first group books moving van hire at short notice, the second plans it.
Canada Water substrates run to often with surface conduit — and precast concrete panels and dense blockwork — which is what a 90% flat share across the ONS neighbourhood covering Canada Water actually produces. Nothing is drilled until the wall has been sounded, because in SE16, drilling blind into a panel with reinforcement or a buried cable behind it — the pattern behind 4,483 households inside the SE16 neighbourhood is the mistake that costs a SE16 customer twice.
Two streets can behave very differently in Canada Water: dock, library and the biggest regeneration site in south-east London. The quote reflects the street the job is actually on. Canada Water sits inside the Congestion Charge zone as well as ULEZ, so both are itemised on the quote rather than absorbed into an hourly rate.
On access, construction diversions, estate loading bays and mandatory lift booking in new blocks — one reason one driver as standard on all three van sizes, with a second loader added by the hour where stairs, a lift booking or heavy furniture make a solo load impractical. Fitters travelling in use Canada Water (Jubilee, Overground).