Walk Haggerston from Regent's Canal at Haggerston Park outwards and the mainly Victorian pattern is obvious: 89% of the 10,083 households in E2 live in flats, 11% in houses.
27% of households rent privately and 22% own, which is why construction site clearance demand here peaks around tenancy changeovers and completion dates.
Expect precast concrete panels and dense blockwork in Haggerston, often with surface conduit — which is what a 89% flat share across the ONS neighbourhood covering Haggerston actually produces behind the plaster in E2. That is why fixings are picked in the room rather than off a van shelf, and why in E2, drilling blind into a panel with reinforcement or a buried cable behind it — which is why London Borough of Hackney kerb rules get settled before the van is loaded is the fault we are called back to undo.
Two streets can behave very differently in Haggerston: regent's Canal terraces, estate blocks and a fast-changing strip of Kingsland Road. The quote reflects the street the job is actually on. Haggerston is outside the Congestion Charge zone but inside ULEZ; our vehicles are compliant, so nothing is added for it.
On access, canal bridges limit access, permit bays throughout and estate lifts needing booking — one reason two operatives with a 3.5t tipper as standard, scaling to four operatives and a 7.5t vehicle on strip-outs or where the waste has to be barrowed a long way to the frontage. Fitters travelling in use Haggerston (Overground).