The guide
RAMS, Lift Bookings and Building Rules: The London Office Move Paperwork in full
What RAMS actually are, and who reads them
A method statement sets out how the move will be carried out — sequence, crew, equipment, protection, and the route crates and furniture take through the building. The risk assessment lists what could go wrong at those two specific addresses and the controls that stop it. Together they are the RAMS.
Building managers genuinely read them, because the risks are theirs too: a wedged goods lift, a damaged common-part floor or a trolley run across a marble lobby at 22:00. A generic template with someone else's address in it gets rejected, which is why ours are written per job.
Westminster: What it means for the paperwork here: Westminster City Council handles bay suspensions and any highway permit for Westminster, while the managing agent handles passes, lift slots and contractor induction. Both are prepared as one document set in your name and submitted five to ten working days ahead, which is the standard lead time across the borough.
Insurance: the numbers buildings check
Two certificates matter. Public liability covers damage to the building and third parties; most London managing agents want to see at least £5 million. Goods in transit covers your property while it is in our care, and the limit should sensibly exceed the replacement value of what is moving — IT equipment on a 60-desk floor adds up faster than people expect.
If your own contents insurance covers goods in transit already, tell your broker the move dates anyway. Cover often lapses the moment property leaves the insured premises.
Westminster: Applied to Westminster: 60,890 registered businesses sit in this borough and 807,000 people work here, so the step above is usually run for a ten to fifty desk suite rather than a whole tower. 81.2% of firms here employ fewer than ten people, which is why the survey and the switchover normally fit into one weekend.
- Public liability certificate, typically £5m minimum
- Goods-in-transit certificate with the limit stated
- Employers' liability for the crew
- Waste carrier registration if anything is being removed
Lifts, bays, passes and permits
The goods lift is the bottleneck in almost every multi-storey London move. Slots are usually booked in blocks with building management and, in the tighter towers, come with a lift attendant charged to you. Book both ends the moment the date is fixed — not the week before.
Loading bays are the second constraint. Some buildings own theirs and reserve it; on street loading you may need a bay suspension from the borough, which typically takes several working days and is charged per bay per day. Red routes are TfL's, not the council's, and have their own rules.
Managed buildings also want contractor inductions and passes for named crew. Give the building the crew list a week ahead, and expect sign-in and sign-out records on every visit.
Westminster: In Westminster the building type sets the pace. Georgian and Victorian buildings converted to office use, listed features and original joinery, reception-led standards, and offices sitting over or beside retail and hospitality. The commercial weight sits around Belgravia, Covent Garden, Fitzrovia, and that decides crate volumes, how many goods-lift bookings the switchover needs and whether it runs over an evening or a full weekend.
Waste, WEEE and the dilapidations file
Anything you leave behind becomes a dilapidations problem, so clearance is part of the move, not an afterthought. Old desking, pedestals and chairs go out on the same visit under a licensed waste carrier, with a waste transfer note issued for your records.
Electrical items — monitors, PCs, printers, fridges — are WEEE and must be routed through a permitted facility. Keep the transfer notes: landlords and auditors both ask for them, and a photographic record of the cleared floor has settled more than one dilapidations dispute.
Westminster: Access in Westminster is the part that slips. Tight loading windows, red routes and camera-enforced streets, narrow service stairs and small lifts, and estates that run their own contractor rules. Congestion Charge, ULEZ, dense CPZs operating to 18:30 and beyond — most jobs need a suspended bay or dispensation. On top of that, part of the borough sits inside the Congestion Charge zone and all of it inside ULEZ, so both are priced into the project figure rather than invoiced later.