In North Woolwich and Silvertown (E16) the split is 74% flats to 26% houses over 2,668 households, and the stock is recent new-build.
With 38% private renting against 23% owner-occupied, most E16 bookings land on a move-in day rather than a weekend.
North Woolwich and Silvertown substrates run to precast concrete panels and dense blockwork; locally that also means often with surface conduit, measured on the walk in from Pontoon Dock (DLR) rather than assumed from a map. Nothing is drilled until the wall has been sounded, because North Woolwich and Silvertown gives us drilling blind into a panel with reinforcement or a buried cable behind it, and with 38% of homes here privately rented, it sets the booking date as often as the job does is the mistake that costs a E16 customer twice.
North Woolwich and Silvertown is outside the Congestion Charge zone but inside ULEZ; our vehicles are compliant, so nothing is added for it. What shapes the job more is the neighbourhood itself — riverside strip of former sugar and rubber works, now under heavy redevelopment — which is why a E16 quote is not a Newham average.
On access, single access road along the river, construction diversions and gated new blocks — one reason one technician for a private path; two where a communal walkway has to stay open to residents while the work is done, so one can manage access while the other washes. Fitters travelling in use Pontoon Dock (DLR).