In Poplar (E14) the split is 88% flats to 12% houses over 10,832 households, and the stock is post-war.
Because 32% of Poplar is privately rented and 46% socially rented, a lot of E14 work is agreed with a landlord or managing agent rather than the person opening the door.
Poplar substrates run to precast concrete panels and dense blockwork in Poplar, often with surface conduit, where 22% owner-occupation means the same home is booked again rather than a new tenant each year. Nothing is drilled until the wall has been sounded, because drilling blind into a panel with reinforcement or a buried cable behind it, as the Poplar stock goes, a median age of 29 in this neighbourhood shapes what gets ordered here is the mistake that costs a E14 customer twice.
Post-war estates, Chrisp Street market and the Blackwall approach roads. That character decides the practical detail of wood flooring here far more than the borough boundary does. Poplar sits inside the Congestion Charge zone as well as ULEZ, so both are itemised on the quote rather than absorbed into an hourly rate.
On access, blackwall Tunnel approach red routes, estate service roads and single-lift tower blocks — one reason one fitter for a floating fit in a single room; two for glued or secret-nailed floors and any job over 25m² in a day. Fitters travelling in use All Saints (DLR).