In Canada Water (SE16) the split is 90% flats to 10% houses over 4,483 households, and the stock is post-war.
With 33% private renting against 20% owner-occupied, most SE16 bookings land on a move-in day rather than a weekend.
Canada Water substrates run to often with surface conduit, over precast concrete panels and dense blockwork, measured on the walk in from Canada Water (Jubilee, Overground) rather than assumed from a map. Nothing is drilled until the wall has been sounded, because Canada Water gives us drilling blind into a panel with reinforcement or a buried cable behind it, and with 33% of homes here privately rented, it sets the booking date as often as the job does is the mistake that costs a SE16 customer twice.
Canada Water sits inside the Congestion Charge zone as well as ULEZ, so both are itemised on the quote rather than absorbed into an hourly rate. What shapes the job more is the neighbourhood itself — dock, library and the biggest regeneration site in south-east London — which is why a SE16 quote is not a Southwark average.
On access, construction diversions, estate loading bays and mandatory lift booking in new blocks — one reason one cleaner for a flat; two for a house, so the property is finished in one visit rather than split across a day. Fitters travelling in use Canada Water (Jubilee, Overground).