9,110 households sit inside the N8 neighbourhood covering Hornsey. The build is mainly Victorian, the tenure profile mixed-tenure, and 67% of those homes are flats.
Because 28% of Hornsey is privately rented and 24% socially rented, a lot of N8 work is agreed with a landlord or managing agent rather than the person opening the door.
Hornsey substrates run to with solid brick on the party and external walls — and lath and plaster over timber studs, measured on the walk in from Hornsey (Great Northern) rather than assumed from a map. Nothing is drilled until the wall has been sounded, because a plasterboard plug spun into lime plaster in Hornsey, which crumbles the key and drops the panel, a median age of 38 in this neighbourhood shapes what gets ordered here is the mistake that costs a N8 customer twice.
Station streets and the old town hall between Crouch End and Wood Green. That character decides the practical detail of wood flooring here far more than the borough boundary does. Hornsey is outside the Congestion Charge zone but inside ULEZ; our vehicles are compliant, so nothing is added for it.
On access, railway bridges with height limits, narrow terraced streets and permit bays — one reason one fitter for a floating fit in a single room; two for glued or secret-nailed floors and any job over 25m² in a day. Fitters travelling in use Hornsey (Great Northern).