In Canada Water (SE16) the split is 90% flats to 10% houses over 4,483 households, and the stock is post-war.
Because 33% of Canada Water is privately rented and 47% socially rented, a lot of SE16 work is agreed with a landlord or managing agent rather than the person opening the door.
Expect precast concrete panels and dense blockwork in Canada Water, often with surface conduit, which is what a 90% flat share across the ONS neighbourhood covering Canada Water actually produces behind the plaster in SE16. That is why fixings are picked in the room rather than off a van shelf, and why drilling blind into a panel with reinforcement or a buried cable behind it, as the Canada Water stock goes, and with 33% of homes here privately rented, it sets the booking date as often as the job does is the fault we are called back to undo.
Dock, library and the biggest regeneration site in south-east London. That character decides the practical detail of flat and apartment clearance here far more than the borough boundary does. Canada Water sits inside the Congestion Charge zone as well as ULEZ, so both are itemised on the quote rather than absorbed into an hourly rate.
On access, construction diversions, estate loading bays and mandatory lift booking in new blocks — one reason two crew and a Luton for a studio or one-bed; three crew and a second van on two- and three-bedroom apartments or any duplex. Fitters travelling in use Canada Water (Jubilee, Overground).