The short version
A UK house move is a six-to-eight week project with one very loud day in the middle of it. Almost everything that goes wrong on moving day was decided weeks earlier: the crew booked too late, the loft left full, the broadband ordered the week before, the meter reading nobody photographed.
This checklist splits the move into 8 timed stages and 48 checks. Work top to bottom, tick as you go, and the last week stops being a scramble. If you are already inside two weeks, jump straight to the one-week stage and work backwards through anything you have missed.
6–8 wks
Sensible lead time to book a removals crew
£650–£1,400
Three-bed local move with a full crew
7–9 hrs
Door-to-door on the day, three crew
30–60
Boxes for an average three-bed house
The interactive checklist
Tick items as you complete them. Progress is saved on this device automatically, and if you are signed in it follows you to your phone — so you can start it on a laptop eight weeks out and finish it standing in an empty hallway. Print / save PDF gives you a clean one-page sheet with no site chrome.
Moving house checklist (UK)
Hello Services · helloservices.co.uk/blog/moving-house-checklist-uk · 8 stages · 48 checks
48 checks
Saved on this device.
- 8 weeks out
Lock the date and book the crew
0/6Nothing else on this list works until a date exists. Removals diaries for Fridays and month-ends fill first, so this is the stage that decides whether you get a choice of crew or take what is left.
Stage 1 of 8 · typical effort: 2–3 hours
- 6 weeks out
Materials, disposals and the awkward items
0/6This is the buying-and-booking stage. Order packing materials, arrange anything that will not go on a van, and flag the items that need a specialist before the calendar tightens.
Stage 2 of 8 · typical effort: 3–4 hours
- 4 weeks out
The admin block
0/6The single most-skipped stage, and the one that generates bills months later. Work through it in one sitting with your account numbers in front of you.
Stage 3 of 8 · typical effort: Half a day
- 2 weeks out
Pack everything you will not miss
0/6Start with the rooms and objects you can live without for a fortnight. Packing early is what keeps the last week calm.
Stage 4 of 8 · typical effort: 6–10 hours across the fortnight
- 1 week out
Room-by-room and confirm everything
0/6Pack down to what you use daily, then re-confirm every booking in writing so no supplier surprises you at 8am.
Stage 5 of 8 · typical effort: 8–12 hours
- The day before
Essentials box and dismantle
0/6Everything today is about the first eighteen hours in the new place. Pack the box you will actually open first.
Stage 6 of 8 · typical effort: 3–4 hours
- Moving day
Readings, walk-through, keys
0/6The day itself is short on decisions and heavy on evidence. Take the readings and the photographs — they are what protect you afterwards.
Stage 7 of 8 · typical effort: 6–10 hours
- The first week
Settle in and close the loops
0/6The move is not finished when the van leaves. This week is about safety, registrations and catching anything that slipped.
Stage 8 of 8 · typical effort: A few hours, spread out
Want the heavy part handled? Get a fixed removals price in about a minute — no survey visit needed.
How a UK move actually runs
Buyers and renters follow different clocks, and confusing the two is what makes generic checklists useless. A purchase runs on exchange and completion: nothing is certain until exchange, and keys only release on completion day when funds clear — often early afternoon. A tenancy runs on fixed start and end dates: you usually get keys at 3pm and must be out of the old place by 10am, which is why renters frequently need one day of overlap or a few hours of storage.
- Date is agreedOffer accepted and a target completion set, or the tenancy start signed. Book removals now, not after exchange.
- Date becomes realExchange of contracts, or the tenancy agreement returned. This is when non-refundable spending is safe.
- The week beforePack down, confirm the crew, defrost the freezer, agree the key handover plan and the late-completion backup.
- Completion dayReadings, load, keys, unload, readings again. Evidence beats memory at every step.
Who to notify, and when
The admin block is the most-skipped part of any move and the one that produces bills six months later. Nobody forwards these on your behalf — each organisation needs telling separately, and the councils need telling twice: once to close, once to open.
| Who | When | Why it bites if you forget |
|---|---|---|
| Broadband provider | 4–6 weeks out | Installs at the new address routinely run 2–4 weeks; this is the longest lead time on the list. |
| Energy and water suppliers | 4 weeks out, readings on the day | Without a closing reading you are billed on an estimate you then have to argue with. |
| Both councils (council tax) | 4 weeks out | Old authority keeps billing; new authority backdates. Both letters arrive at once. |
| Royal Mail redirection | 4 weeks out (min 5 working days) | Bank cards and annual statements go to strangers. |
| Insurers (buildings + contents) | Before exchange | Buildings cover on a purchase is normally required from exchange, not move-in. |
| DVLA (licence and V5C) | As soon as you move | Free to change, and a fixed-penalty matter if the address is wrong. |
| Bank, employer, HMRC, pension | Move week | Missed payroll and benefit letters, and a credit file that no longer matches. |
| GP, dentist, vet, schools | 4 weeks out | Registrations take time; prescriptions and in-year school places do not happen overnight. |
| Electoral roll | First week in | Also feeds your credit file — worth doing before any remortgage. |
Packing: the system that saves days
Packing is not one task, it is a sequence. The people who unpack in three days rather than three weeks do the same three things: they pack room by room, they never mix rooms in a box, and they label a priority number alongside the room name.
The labelling system worth copying
- Room — where the box is going, not where it came from. Boxes from the old study that belong in the new spare room get labelled spare room.
- Priority 1–3 — 1 is opened tonight (bedding, kettle, bathroom), 2 within the week, 3 whenever. Only priority 1 needs to reach the right room precisely.
- Contents summary — five words, not an inventory. "Kitchen: pans, chopping boards, foil."
- Two sides, never the top — stacked boxes hide their own lids.
- Fragile marked on all four sides, with plates packed on edge like records rather than stacked flat.
If time matters more than money, a professional packing service typically adds £300–£700 to a three-bed move, and — importantly — brings crew-packed boxes inside the firm's transit insurance, which owner-packed boxes often are not.
What moving house costs in the UK
Removals is the biggest single line, but rarely the whole bill. Budget for the clean, the clearance of what you are not taking, and the handyman jobs that appear in week one.
- Studio / 1-bed, man with a van£180–£420Two hours' loading, local move
- 2-bed flat, removals crew£400–£900Two crew, one Luton, same-day
- 3-bed house, removals crew£650–£1,400Three crew, 7.5t van, local
- 4-bed house, removals crew£900–£2,200Often two vans or two trips
- Full packing service, 3-bed£300–£700Added to the removals price
- End of tenancy clean, 2-bed£160–£300Deposit-standard, empty property
| Extra | Typical cost | Worth it when |
|---|---|---|
| Full packing service | £300–£700 | You are working through the move, or moving with small children. |
| Fragile-only packing | £120–£250 | You have glassware, art or a lot of kitchen ceramics. |
| Dismantle and rebuild | £60–£180 | Wardrobes, bunk beds and gym equipment. |
| Overnight storage | £80–£250 | Completion dates in a chain that may not align. |
| End of tenancy clean | £160–£320 | You are renting — it is the top deposit deduction. |
| Clearance of what stays behind | £100–£400 | Loft, shed and garage contents you are not taking. |
Moving day, hour by hour
A typical three-bed local move with three crew, keys at midday. Shift the clock, not the order, if your handover is later.
| Time | What is happening | Your job |
|---|---|---|
| 07:30 | Crew arrive, walk the property, protect floors and door frames | Point out fragile items, the loft, and anything not going |
| 08:00–11:00 | Loading, heaviest and largest first | Stay out of the carry route; keep kettle and essentials aside |
| 11:00 | Final walk-through of every room, cupboard and the garden | Photograph meter readings with a timestamp |
| 11:30 | Keys returned to agent or handed to the buyer | Leave bin day, stopcock and boiler notes behind |
| 12:00–13:00 | Transit, and the wait if funds have not cleared | Keep the crew leader and your solicitor talking to each other |
| 13:00 | Arrive, readings taken before anything is unloaded | Photograph the new meters, check nothing is damaged |
| 13:00–16:30 | Unloading, boxes directed by room | Stand at the door and direct — it saves an hour later |
| 16:30 | Beds rebuilt, inventory checked, damage noted before signing | Note any damage on the paperwork, then sign |
Renting: protecting your deposit
Cleaning is consistently the largest single cause of deposit deductions in England and Wales, followed by damage and rubbish left behind. The standard you are held to is the check-in inventory, allowing for fair wear and tear — not "clean", but "as clean as the day you moved in".
- Book the clean for after the van has left. An empty property cleans properly; a half-full one does not.
- Photograph every room, appliance and the oven interior once the property is empty and cleaned.
- Take the same photographs at the new property on day one, before you unload.
- Check the tenancy for specific requirements — professional carpet cleaning and oven cleaning are commonly named.
- Keep receipts. A dated invoice from a cleaning company settles most disputes without a scheme adjudication.
- Chase the check-out report in writing, and reply to any proposed deduction in writing.
If you would rather hand that part over, our end of tenancy cleaning is priced to the inventory standard, and the end of tenancy price guide sets out what it costs by property size.
Eight mistakes that cost real money
- Booking removals after exchange. By then the good crews are gone and you are paying a premium for whoever is left.
- Leaving the loft, shed and garage till last. They hold the most volume and the least sorted contents, and crews will not enter a loft.
- No meter photographs. Months of estimated billing you cannot disprove.
- Ordering broadband the week before. Two to four weeks is normal; working from home without it is not.
- Skipping the parking suspension. A £40 bay is cheaper than a long-carry charge on every single item.
- Mixing rooms in boxes. Turns three days of unpacking into three weeks.
- Packing the kettle. Or the loo roll, or the phone charger. Hence the essentials box.
- Cleaning around furniture. Inventory clerks look behind and underneath. Clean after the van has gone.
Frequently asked questions
Related services
- House removalsInsured crews, fixed prices, dismantle and rebuild included on request.
- Man with a vanSmaller moves, part-loads and single items, charged by the hour or fixed.
- Professional packingFull or fragile-only packing, with crew-packed boxes covered by our insurance.
- End of tenancy cleaningDeposit-standard cleans booked for after the van leaves.
- House clearanceLoft, shed and garage contents cleared with a waste transfer note.
- Handyman visitOne visit for the week-one snag list: TVs, shelves, blinds and sticking doors.
You might also find useful
- Man with a van prices UKReal hourly rates, fixed prices by job size and the extras to check first.
- End of tenancy cleaning pricesWhat a check-out clean costs, and what the inventory clerk actually checks.
- House clearance cost UKPrices by property size, and council bulky waste versus private clearance.
- Packing a three-bed house in ten stepsThe room order, the materials list and the timings that make it work.